Working in the Consolidation Scenarios tab

Application database > Processes tile > select process > Consolidator > select Consolidation Scenarios

Application database > > Navigation panel > Processes > select process > Consolidator > select Consolidation Scenarios

Update node status indicators

This procedure allows you to check whether contribution data has been edited.

In Nodes, click : the data processing status indicators will be updated.

Process a non-significant node

  1. Select the node to process.
  2. In Actions, click Consolidation data processing and select Custom: the Consolidation data processing window will appear.
  3. (Optional) In Original Scenarios/Periods, add any desired scenarios/periods to the scenario/period with which access was gained.
  4. (Optional) To only process data edited after the last consolidation data processing, select Process only modified data.
  5. Select the data to process (entity, group, area).
  6. In Consolidation scenarios/periods, select one or several consolidation scenarios/periods on which to run the data processing.
  7. To start the data processing, click Run.