Schedule data processing

Approve a data processing operation

Repository > Scheduling

  1. Select the operation to be approved, first in the tree and then in the table.
  2. In Attributes, select Enabled: the approval tick will appear in the Enabled column of the table.

Create a scheduled data processing group

Repository > Scheduling

  1. Click : a new row will appear in the table.
  2. In the Attributes tab, enter the group’s ID code and description.
  3. Set the desired parameters in the remaining configuration tabs.
  4. Click Save: the group schedule will appear in the tree.

Add data processing operations to a group

Repository > Scheduling

  1. Run the desired process:
To act... Then...
in the tree Select and drag the desired operation to the group schedule.
in the table 1. Select the desired data processing operation. 2. In the Attributes tab > Parent group select the desired group.
2. Click Save.

Manage a scheduled data processing group

This procedure makes it possible to set valid parameters for all scheduled data processing operations in the group.

Repository > Scheduling

  1. Select the group of interest in the tree and then in the table.
  2. Change the parameters of the configuration tabs as desired.
  3. Click Save.

Enable/disable scheduling on a specific server

Repository > Monitor > Server Status

  1. Select the row for the desired server.
  2. Click in the Allowed schedules field: select/deselect the tick box to enable/disable the data processing schedule on the server.

Associate a scheduled operation with a specific server

Repository > Scheduling

  1. Select the desired scheduled data processing operation in the tree and then in the table.
  2. In Run settings, select Permitted servers.
  3. In Specific servers indicate the server to which to associate the selected data processing.